"> Metal Buildings Ocala, FL | Complete Erection, Slab to Steel
Commercial

Complete metal building erection · Ocala, FL

Metal buildings, built from the ground up.

We prep the site, pour the slab, set the anchor bolts and erect the whole steel building: shops, garages, barns, RV and boat storage, flex space and retail. One contractor from dirt to doors, anywhere in Marion County.

Mon–Fri 6 AM–6 PM · Sat 8 AM–5 PM · Sun 6 AM–6 PM · Free estimates

Request a free bid

Name
Slab→SteelOne crew, one contract
ItemizedWritten bids
COICertificates on request
5.0★Google reviews, word for word

How it works

Dirt to doors, one contractor

Most metal building headaches start between trades: the slab is poured, the bolts are off, and the concrete crew and steel crew blame each other. When one company does both, that gap disappears.

  1. Site visit & scope. We walk the site, talk through size, doors, use and access for trucks and steel deliveries.
  2. Drawings & permit. The building package comes with engineer-sealed drawings for your site’s wind speed and exposure. We coordinate the permit, or confirm the farm-building exemption.
  3. Site prep. Clearing, grading and compacting the pad, with soft spots and clay pockets dug out and replaced.
  4. Slab or footings + anchor bolts. Monolithic slab, footings or piers poured to the foundation drawings, with bolts set from the steel supplier’s anchor-bolt plan and checked before the pour.
  5. Steel erection. Frames, purlins and girts, roof and wall panels, trim, doors and windows.
  6. Walk-through. We go over the finished building with you and leave the site clean.

What we build

Metal buildings for homes, farms and businesses

Shops & garages

Workshops, detached garages and man caves with roll-up doors, walk doors and windows.

Barns & ag buildings

Horse barns, hay and equipment barns, run-in sheds. See equestrian concrete.

RV, boat & self-storage

Covered and enclosed storage with tall doors and drive aisles.

Flex, warehouse & contractor buildings

Small warehouses, contractor yards and flex space near Ocala’s commerce parks.

Retail, office & churches

Clear-span buildings finished out by your interior contractor.

Carports & pavilions

Open-sided structures on piers or a slab.

Costs

What metal buildings cost around Ocala

WorkTypical range*What moves the price
Installed metal building on a slab≈ $25–$70 / sq ftSteel package, wind rating, doors, insulation, finishes
30×40 building, installed≈ $32k–$85kDoor count and size, insulation, slab thickness
40×60 building, installed≈ $65k–$165kClear span, eave height, upgrades
50×100 building, installed≈ $140k–$300kCommercial use, framed openings, wind rating
Erection labor only (your kit)≈ $6–$14 / sq ftBuilding complexity; small jobs carry a minimum
Concrete slab for the building≈ $6–$16 / sq ftThickness, thickened edges, vapor barrier, site prep
Kit only (for reference)≈ $14–$30 / sq ftKits are often only 40–50% of the finished project cost

*Typical Ocala-area ranges only. Your exact price depends on building size and eave height, the steel package and wind rating for your site, doors and openings, insulation, site prep and the foundation, and current steel prices. You get a written price after a free on-site estimate.

Why one contractor

What slab-to-steel gets you

01

Anchor bolts that match the steel

Steel erectors expect anchor bolts set much tighter than everyday concrete tolerances. We set them from the supplier’s anchor-bolt plan, check them before and after the pour, and then erect the steel ourselves.

02

Designed for the wind where it sits

Marion County uses different design wind speeds by location and building risk. Your drawings carry the right number for your parcel, not a one-size marketing figure.

03

Florida humidity planned for

Vapor barriers under the slab and condensation control under the roof keep equipment, feed and vehicles dry.

Google reviews

What our customers say

★★★★★

“We contracted them for foundation work and a new slab at one of our light industrial buildings. Clear scope, fair pricing and solid execution. The slab is level and finished well.”

Brisa R. · 5.0 ★ Google review
★★★★★

“We used them for a new garage floor. They leveled everything out and the finish is smooth and durable. No complaints at all.”

Oliver T. · 5.0 ★ Google review
★★★★★

“I was really impressed with the quality of the work. Very professional and reliable! Communication was good, and the job was completed exactly as expected. You can tell they take pride in their work. Highly recommend Coleman Concrete!”

Leilani J. · 5.0 ★ Google review

Read our reviews on Google →

Common questions

Before you request a bid

What does 'complete metal building erection' include?

Site layout and prep, the slab or footings with anchor bolts, and erection of the full building: frames, girts and purlins, roof and wall panels, trim, walk doors, roll-up or overhead doors and windows as specified. We tell you up front what’s included so there’s no gap between trades.

What wind speed does my building need in Marion County?

It depends on where it sits and how it’s used. Marion County’s permit guidance uses 130 mph for ordinary (Risk Category II) buildings in the north part of the county and 140 mph in the south, with higher values for higher-risk buildings. Your engineer-sealed drawings set the exact number. We don’t guess.

Do I need a permit for a metal barn?

Most metal buildings need a permit with engineer-sealed plans. Nonresidential farm buildings on land used for bona fide agriculture can be exempt from the Florida Building Code under F.S. 604.50. The exemption does not cover living quarters or flood-zone rules. We’ll help you check before you order.

How thick does the slab need to be?

Whatever the building’s foundation drawings call for. Shops and garages often get a monolithic slab with thickened edges at the columns; heavier equipment, lifts or racking need more. We pour to the engineer’s design and set the bolts to the steel supplier’s anchor-bolt plan.

Can I buy the kit myself and have you build it?

Yes. We can pour the foundation to your supplier’s drawings and erect the building. Send the anchor-bolt plan and erection drawings with your bid request.

What about condensation in Florida's humidity?

Uninsulated steel sweats in Ocala’s humidity. We recommend a vapor barrier under the slab and insulation or a condensation-control liner under the roof for any building that stores equipment, feed or vehicles.

What does a metal building cost in Ocala?

Typical installed ranges run roughly $25–$70 per sq ft* for an engineered red-iron building on a slab. A 30×40 often lands around $32k–$85k* and a 40×60 around $65k–$165k*.

*Typical Ocala-area ranges only. Your exact price depends on building size, the steel package and wind rating, doors, insulation, site work and current steel prices. You get a written price after a free on-site estimate.

Free estimates · Commercial bids

Tell us about the project.

Homeowners get a call back to set up a free on-site estimate. Businesses, farms, HOAs and general contractors get a written, itemized bid, send plans or a quick description and we will walk the site.

Call (352) 352-4481

Mon–Fri 6 AM–6 PM · Sat 8 AM–5 PM · Sun 6 AM–6 PM
Ocala, FL 34471

Name
Call nowFree estimate